http://psiwiki/IGenesis_Load_Schedule_z0068#.22Build_Docs.22:
Print Docs: After the load is verified, the Print Docs function will be enabled; but can not perform this function until the Build Docs is complete. After the shipping documents are built, the user can select this function to print the shipping documents for the load.
In plants where appattr Plant#TagCheckAtBuild is turned on, there is an extra verification process required by the shipping clerk or driver to scan or enter all inventory id tags again. The Check Load Tags screen will populate. The user can either scan the tags on the white scanner hooked up to the Kiosk or Shipping Clerks desk or the shipping clerk will have to manually enter the tag's inventory ids again. If the wrong number tag is entered, a supervisor override will be required to continue the shipping process. If not all the tags have been scanned, the user will be advised what tag number they are missing and not allow the user to proceed with the check out until all inventory verified to the load is scanned.
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article