For future reference, here are the status numbers and procedures with screen shots and videos on shipping a basic load. There is nothing to fix or an issue here.
Status Numbers for shipping a load:
0: Load is in "Scheduled" status
1: Load is in "Arrived" status.
2: Load is in "Loading" status.
3: Load is in "Generated" status.
4: Load is in "Built" status.
5. Load is in "Printed" status.
6. Load is in "Verified" status. This is for Cliffs Owner 55 loads that are released in the Cliffs system. Mill Verified.
9. Load is in “Shipped” status.
Step 2 arriving or checking in for a load
Ship.Load.process.step.15.Check.in.Kisok.video.screen.w0362.mp4
Step 3 loading status (automatic) when selecting inventory to generate to the load.
Step 4 Generating the load
Ship.Load.process.step.4.Generate.Load.Video.mp4
Step 5 Verifying Load
Ship.Load.process.step.9.Verify.Load.with.Enter.Measurements.screen.d0391.Video.mp4
Ship.Load.process.step.20.Optional.Supervisor.Watch.For.Load.screen.d0416.process.mp4
Step 6 Building Documents
Step 7 Printing Documents
Step 8 Releasing the Load
Ship.Load.process.step.28optional.Supervisor.Override.process.screen.d0164.mp4
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article